Boiling Spring Lakes Fire Department
Description
This 12,205SF cutting-edge design was tailored to the specific needs of Boiling Spring Lakes area. The project included advanced firefighting technology and infrastructure with ample space for 6 fire apparatuses, gear storage, and training facilities. Integration of sustainable building practices, energy-efficient systems and adherence to stringent safety standards and regulations were priorities. Erosion Control measures were also put in place.
- Completed in 2024
- 12,205 Total Square Feet
- 6,133 Square Feet Bays
- 6,072 Square Feet Office Space
- 80’-0” Deep Bays